Sonris says this has been waiting on pipeline since Dec 2008. Anyone seen any sign of the pipeline progress?
Any news on pipelines in this area in general?
Any idea if this is for a pipeline from the well or a regional pipeline to the area in general or both?
Section 31 will be the Rocking G Farms 31H No.1 for ENCANA. Then hopefully Well 30H No.1 will follow with its bottom in Sec. 30. Maybe they will tie to the pipeline going to Harris 19. Possibly ENCANA is waiting to bring all 3 to production at the same time.