Towards the middle of the document
"
Its most recent Woodbine completion, Jackie
Robinson 2-H, came on at 371 barrels of oil, 20
barrels of gas liquids and 55,000 cubic feet of
dry gas or a combined 400 BOE in its first 24
hours on a restricted 16/64-inch choke. It made
an average of 270 BOE per day in its first 30
days on a 22/64 choke. The EUR is some
350,000 BOE.
Wells in this new play, which is currently focused in Grimes, Madison, Leon and Brazos
counties, cost about $4.5 million apiece for
6,000-foot laterals and 21 frac stages spaced
about 225 feet apart. “Part of the lower cost is
because it’s shallow at about 7,500 feet,” says
Frank Starr, Crimson Energy president.
Also, because of the conventional nature of
the rock, a low-horsepower rig of about 1,000
HP may be adequate. And, frac jobs in the
mostly sandstone formation are at relatively
low pressures compared with completing a well"
Lots of good stuff in following paragraphs as well. Looks like the region is in for a big boom
Tags: Buda, Crimson, Eaglebine, Glen, Rose, woodbine
Amen!
Thanks Dbob,
Now I am totally confused ------ this article says that "this formation is easier to frac than a shale" and I thought the Clays we had in the EFS (Eaglebine) made the frac more difficult than the South Texas EFS
The rig turn around days is impressive ---- along with the AFE etc.
386 members
399 members
119 members
8 members
97 members
59 members
242 members
172 members
455 members
87 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com