Have no idea but I remember that they were in a really big hurry to lay the line. Made a few people upset because they didn't want to pay for the timber they were going to cut down. The capacity must be huge because they paid the money and got the pipeline done.
I work for the company that laid a 42" line and are laying another one. Centerpoint has also laid one. However all these lines have contracts for 96% of the capacity for gas from the barnnet shale. And these are firm contracts and run for 10 years. So, these new lines have nothing to do with the haynseville shale. Capacity of these lines by the way is 1.7 billion cubic feet a day. And that is each line.
I have two pipe lines (laying besides each other) running through on one side of my property. They cut down alot of trees for a long distance here in Doyline a few years ago to put the right-away in. I wonder if they will use those two lines already put in place, or add another line next to the those two?
My best guess is they will pipe all wells to a central area and then install dehydration units to dehydrate the gas (strip out the condensate and water). After that they will simply put the gas into transportation lines (which are close to being maxed out at the moment with Barnnet Gas). Unless there is high amounts of butane etc. most gas is simply stripped of liquids. Transportation systems do not move wet gas. All gas has to be stripped of condensate and saltwater before transportation companies will put it in the pipe. Transportation companies (I work for one) are in a scramble to make deals and bring in new pipe to handle the movement of the haynesville shale gas. All dehydration will be done by the producers, that being said I dont think that part will be a problem.
I have been tracking DCP Midstream Minden Gas Plant near the CV field and see where DCP (owned by ConocoPhillips and Spectra Energy) are seeking to hire a plant manager and safety inspector for the Minden Plant.
Does this mean they are gearing up or nothing at all?
Actually, I will add the exact job descriptions in a few.
Full Time/Part Time: Full Time Regular/Temporary: Regular Job Board Category: Oil and Gas Job Description: General PurposeTo coordinate and direct the......
Location: LA - Minden Date Posted: 7/31/2008
Asset Compliance Coordinator
Full Time/Part Time: Full Time Regular/Temporary: Regular Job Board Category: Oil and Gas Job Description: Essential Functions: (Functional......
Location: LA - Minden Date Posted: 7/28/2008