Comstock noted the following completion hasn't "hit the wire"...what does hit the wire mean?
This well has surface location of s33/t13/r16 but bottom hole is s04/t12/r16

•Ramsey 4 HZ #1: 15.0 MMcf/day IP; Belle Bower Field, DeSoto Parish, S33/T13/R16; res. A,
•serial #240506 (18 frac stages on 4,616' lateral)