The Hassell Gas Unit Well No. 7H was completed
to 16,836 feet 1.1 miles southeast of Attoyac in the Carthage Field by EOG Resources. On a 14/64-inch choke the well potentialed 11.310 million cubic feet of gas. Production is in the Haynesville Shale.
D. Gaar-- looking at wells with formation top in this area what's depth top of Boosier Shale then depth top of Haynesville Shale? Like above in the Hassell #5H is 13,402 top of haynesville shale just below the bossier? So that these are True Haynesville shale wells rather than Bossier shale wells producing in the "Carthage Haynesville Shale Field" ?
Formation report listed on this Hassell #5h did not list the formation top for the Bossier, but did list Haynesville formation top at 12,862' and pay zone at 13,402'.
The formation top for the CV "B" Lime was listed as 11,313' a full 1,500' below the HA top listed. That said, it does appear that the pay zone is likely HA - as reported.