The well in my section ser# 240766 has shown on SONRISE "Waiting on coil tubing" since Nov 1st. I can't find what this means. Anyone that can help? I know the pipeline is already in place and I am pretty sure it's tied in.
BT, it means they are waiting on a coiled tubing unit to drill out the plugs that were installed between each frac stage. Once plugs are drilled out the well can be flowed to the gas sales pipeline and tested for filing the potential report with the State. All this may have happened already.