Recently I drove over to take a look at the drilling site on the C Hereford Survey. Quite impressive. Huge drilling pad and derrick. I noticed there has already been pipeline ran to the well. It is my understanding the well is still in drilling mode and there is no production as of yet. I'm curious to know if it is common to run pipeline before there is any known production. Seems to me that the company must be confident in knowing the well is going to be a really good producer even before production starts.
Does anyone know if this is common in the oil and gas industry?
Tags:
The History of GoHaynesvilleShale.com
GoHaynesvilleShale.com (GHS) was launched in 2008 during a pivotal moment in the energy industry, when the Haynesville Shale formation—a massive natural gas reserve lying beneath parts of northwest Louisiana, east Texas, and southwest Arkansas—was beginning to attract national attention. The website was the brainchild of Keith Mauck, a landowner and entrepreneur who recognized a pressing need: landowners in the region had little access to…
ContinuePosted by Keith Mauck (Site Publisher) on May 21, 2025 at 6:00
246 members
121 members
193 members
146 members
400 members
101 members
150 members
358 members
166 members
9 members
© 2025 Created by Keith Mauck (Site Publisher).
Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com