I don't have an interest in this one, but I see a similiar situation playing out in the one I do have an interest in. Cook Taylor 8-1H (10N-11W). EnCana drilled and Shell operated. After about 60 days of operation, well went down for work on the choke and now 50 days later they are still trying to fish the wire line out of the hole.
does that mean 7100 mcf a day ? sorry not to up on all this stuff. if so is that a pretty good average? thanks
yes, per day. good flow rate if it stays there.
237025 MCF. averaging 8 million a day. still going strong. Came back on 3/29 and still producing so far.