Oct 4th 2008 -- After months of negotiations, the Greenwood Hills Group (over 350 landowners) signed with JPD Energy on behalf of CHK. We were given a 25 day Draft and a Pat on the back.
Oct 10th 2008 -- After reading on this board about CHK $ problems (Not paying until Jan) I called and talked to Pedro @ JPD. He told me the Drafts would be paid on time and everything was moving forward as expected.
I posted it
here
Oct 20th 2008 -- I received a phone call from Pedro @ JPD Energy telling me that the landowners without Mortgages would be paid with the Drafts. Anyone with a Mortgagee would be required to have their Lender complete a
non-disturbance form and mail it to JPD Energy . The Bank Draft would be paid if the
non-disturbance form was received before the draft expired. If the
non-disturbance form was received after the Draft expired the Landowner would be paid by check.
I asked Pedro about contatcting the other members of the Greenwood Hills Group explaigning this.
He stated that he was going to call everyone that he had a phone # for which I thought was strange (over 350 members)
Nov 5th 2008 -- (
3 Business days before the Drafts come due) I received the
non-disturbance form and a copy of my Signature page from JPD Energy in the mail. The letter was dated Nov. 4th
Along with the forms was a letter from JPD Energy stating
"The first set of drafts is scheduled to be funded Nov. 10, according to our bank. If we do not receive the completed forms from your lender, the draft will lapse, you will not be paid and your signature page(s) and W-9 form(s) will be returned to you"
Even though JPD Energy told me on Oct 20th that the forms would be required they took 17 days - 12 Business days to mail me the required forms
I have contacted my Lender (Chase Home Mortgage) and they have their own
non-disturbance form that they require JPD Energy to fill out along with a few other things and $300
The $300 is a part of doing business but I cannot get the forms filled out and submitted in the 3 Business days that JPD Energy has allowed me. This is an Impossible Task in 3 days
Therefore according to the letter I will not get paid for my lease
I probably could have gotten it done if JPD Energy would have mailed me the forms within a reasonable amount of time. That and not told me that I would get paid by Check if the Draft expired
(Note: Faxed or Emailed forms are not accepted only Originals)
I feel that JPD Energy/CHK is using this Tactic to split up the Greenwood Hills group into 2 parts.
They will signup and pay the None Mortgaged and reject the Mortgaged landowners.
By doing this they will have successfully split our group into 2 groups and may have enough of our section signed up to Force Pool the Mortgaged Landowners.
I think JPD/CHK will then offer the Mortgaged Landowners a ridiculously low singing bonus or Force Pooling therefore Screwing us
I hear they have done that in Keithville after dropping their leases
I know that the Southern Hills group has not signed but have already been sent
(well in advance) a Letter from JPD Energy explaining they will be required to complete a non-disturbance form
I also know that they are going to sign for Thousands less that the Greenwood Hills Group signed for..
I find it hard to beleive that JPD/CHK has leased Thousands of Mortgaged Landowners in the Past and has never asked for a
non-disturbance form but now they are requiring one from the Greenwood Hills Group at the last minute (An Impossible Task)
Something Smells Funny
Bottom line is
Beware of the New Group Splitting Tactic of JPD Energy/CHK