I wonder if this will be similar to what happened in section 28 where the James Formation was encountered. Is there any information floating around as to what may be happening in this region, or do we have to settle for SONRIS updates?
Pamela, once the equipment is on location and the process started the typical fracture stimulation job should take 7-10 days. But it is highly uncertain when XTO will schedule the work to be performed.
XTO may elect to move the drilling rig to the following well targeted for Section 29 since it is a permited location but that depends on various factors including the term of the rig contract.
XTO, Blankenship 29 #H1 Well, Serial #243540, S32(29)-T10N-R10W