Tags:
Bob they are back to fracking the Birdwell 22 well this morrning.
Thanks for the update Pine Knot
Thanks for your update too Pine Knot. Any signs of infrastructure construction from the Birdwell well to a main downstream transmission pipeline?
Pipeline ROW has been puchased and they should start laying pipe soon. Wells in sections 15,22,28 and 29 have now been fracked. They finished the last one this week. Running 5 inch liner on 22 today it should be ready to produce as soon as the pipeline gets laid. They are all waiting on pipelines. Let yall know when I see a dozer any where.
Thanks for the update Pine Knot. That's great news for me. What exactly is 5 inch liner? I am assuming that 22 means section 22? Will all of the other section's pipeline have to be completed before any of the wells can start producing? Thanks again.
Pamela, a 5" liner is similar to production casing but does not extend all the way to the surface.
Thanks for the update Brian. The well in Section 28(Steadmans) has been a big mystery so good to see that they are going to frac it. Let us know if they frac Section 29(Blakenship) afterwords.
The dozer started clearing the pipeline today between the Powell and Birdwell wells. Said to be only 4,000 feet to lay to tie into the Center Point line.
Section 22 Birdwell is selling gas now.
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by