Ensign Drilling SW Rig #753 reports 21 Days Drilling Ahead @ 10,960', 4/4/14.
Ensign Drilling SW Rig #753 reports 28 Days Drilling Ahead @ 11,531', 4/11/14.
Ensign Drilling SW Rig #753 reports 35 Days Drilling Ahead @ 14,710', 4/18/14.
Skip:
3,159 ft of lateral in a week aint to bad. Hope the remainder goes smooth.
Thanks ~ ~ John
JP, any idea what average days to TD are running?
Skip:
Haven't really focused on it much due to the fact there were so many drilling issues that were stringing these wells out. Kind of like going to Talladega and x amount of cars blew their engines on the starting line so to speak. You quit looking at the blown engines and focus on the few that made it across the finish line.
But 35 to 45 days average right now would be great if they can consistently do it. I think some of this latest round of wells have been going pretty good.
EOG demonstrated clearly that it can be done in 35 days or slightly under and I think the Blades came in at around 36.
The important thing is they appear to be making great strides in their ability to D & C these wells, bringing the cost down and oil flow up.
I speculate they will probably get it into the 25 day range at some point in time in the future.
~ ~ John
I was looking for a benchmark to compare the new wells against. Are there no wells that didn't experience mechanical problems?
There are, but I have just been way too busy to pull a bunch of Form 3's and do the math. Maybe when I get some slack time I will.
~ ~ John
Ensign Drilling SW Rig #753 reports 42 Days Drilling Ahead @ 17,355', 4/25/14.
This discussion has been moved to the Amite County Group.
409 members
307 members
286 members
6 members
49 members
691 members
253 members
7 members
549 members
20 members
Posted by don burkett on September 17, 2026 at 10:08
© 2026 Created by Keith Mauck (Site Publisher).
Powered by