Does anyone have any insights about plans to drill within the perimeter of the Dolet Hills Lignite Mine?  So far, I think (?) that only the sections on its perimeter have been getting drilling permits.  I am wondering if anyone knows when (if?) gas drilling might occur inside the permit area of the lignite mine.  Or will drilling wait until the mining is complete?  If so, when might that be?  Does anyone know?

Tags: Dolet, Hills, Lignite, Mine

Views: 52

Replies to This Discussion

Not sure if this helps Henry but activity very near the mine is certainly ramped up lately. Our land in S2 & S11 (double churches) of T11N R12W is currently drilling with Chesapeake. That property in Section 2 is an 1/8 of a mile from the mine and looks to be next to be drilled from the same pad site where S 11 is underway. Many other pad sites ready as well.

It was great to be in Pelican this last week. Had a nice visit with the ladies at the library. I have a call into DHMV

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service