tony, I'm in the mountains on a dial up connection so I can't look up anything in the SONRIS databases. The application is for multiple drilling & production units (not wells as such). The state places no time frame requirement on the drilling of a unit. The unit order is good indefinitely and the operator may choose to drill in the future at their leisure. Hunt Oil will decide when and if they will drill a well or farm out some of their development rights. I can't check for any existing production so it's possible that the determining factor is the length of existing leases.
286 members
6 members
49 members
409 members
691 members
253 members
7 members
549 members
20 members
196 members
Posted by don burkett on September 17, 2026 at 10:08
© 2026 Created by Keith Mauck (Site Publisher).
Powered by