Received notification from Office of Conservation today that Chesapeake has filed to form Unit HA RA SU K in Section 25, T12N, R13W. (Haynesville Zone, Reservoir A)
I read a press release from EOG about 4th quarter earnings. In it, they described production from 2 recently completed wells nearby. In sec 2, 11N, 13W, the Martin Timber #2H was metered at 17.4 MMcfd with 4,700 psi flowing tubing pressure. The Bedsole 27#1H (sec 27, 12N, 13W) was metered at 17.5 MMcfd with 7,400 psi flowing tubing pressure. Due to pipeline capacity difficulties, the two are producing at a combined restricted rate of 17 MMcfd. Eureka.
I and my family have land in section 27, 12n,13w-actually joining some of your land at the Oxford Road area. i now live in Houston.
Do you know how thick the shale is on the EOG Bedsole27 #1 well on section 27 is? The fact that it has 7,400 psi flowing tubing pressure, is very promising.
Also do you know the shale thickness on the EOG Martin Timber #2H well?
Ben:
don't know the shale thickness, but I got EOG to send me all their log reports from when they started drilling the Bedsole well. i will share these with you if you contact me thru this website.
I also got a nice aerial photo of the planned well sites in 34 and 35 along with production numbers every day for the first 28 days. On the photo (map) there is the name Margaret Robertson Moody. Is that you?
Would you give me the contact person at EOG person at EOG that gave you the log reports, etc. I am in 33, 12N, 12W leased to CHK. However, EOG has applied to unitize te section.
2/12/09 Received notification from LA Office of Conservation regarding proposed unitization of S25-T12N-R13W. Called and talked to Sandy Pourciaux [Onebane Law Firm of Lafayette representing Chesapeake] Discussion group of Chesapeake representatives and geologists, mineral interests and landowners, landmen and other interested parties will be held at Shreveport Petroleum Club at 3:00 on Wednesday 18 February. State hearing on the proposal will be held in Baton Rouge on St. Paddy's Day.
Ms. Pourciaux also told me that a general time line is for the OOC to take 30-45 days from the hearing to final approval of the proposal; followed by well-site prep; 6-8 weeks for drilling; and then some time for finalization and laying pipe.
I guesstimate from that data that no revenue stream (other than leasing) will occur until mid-July earliest.