When a said production unit with multiple well signs at the entry gate indicates subsequent "wells" drilled after the initial well... how/why are they designated "Alt"? What creates the label "Alt"?
Thank you for your time.
Brian
Tags:
The first well in a unit is the unit well. All subsequent wells drilled in that unit are alternate unit wells and are designated with numbers: Alt-1, Alt-2, etc. Now depending on the surface location of a particular well, the well names may be different but that doesn't matter. What matters is that all the wells have the same unit designation: HA RA SUR, for example. When an operator wishes to get permission to drill alternate unit wells they must apply to the Office of Conservation for spacing approval. For example, Haynesville Shale horizontal wells can not have a perforated lateral located any closer than 330' from unit boundaries on the east and west sides of sections and must be 660' apart (330' for both adjacent wells) within the unit.
6 members
49 members
286 members
409 members
691 members
253 members
7 members
549 members
20 members
196 members
Posted by don burkett on September 17, 2026 at 10:08
© 2026 Created by Keith Mauck (Site Publisher).
Powered by