There has been one well drilled in our section (we are in Section 30, T16N, R10W, Bossier, well drilled in Section 19),,,WHEN and IF ever they do drill another well, are they required to notify us?
Tags:
It will be a similar process to the first well.
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by