Can someone please interpret this for me (well # 238490 in s28 t18n r16w)?

Can someone please help me interpret the information that is on Sonris? It is pertaining to well # 238490 which is in s28 t18n r16w in Caddo Parish. I can see that they are drilling and I know that there is not currently any production, but I was hoping that someone could give me a little more info. This well is on family property. The family leased to Petrohawk back in August. There was an existing well on the property and our family had been receiving royalties off this well for a while. I believe that Pertrohawk took the existing well horizontal, but not really certain. Thanks in advance for any help!

Views: 82

Reply to This

Replies to This Discussion

They have completed the vertical leg. They set 7" pipe to 9750' with 735 sacks of cement.

They are waiting on completion, then they will begin the horizontal leg. (They are permited to drill a total depth of 14929 feet, if they drill the full permited depth the lateral will be about 5,179' long. It will go a little deeper, as it takes a certain distance to turn the pipe from vert. to horz.)
Thanks, Baron. What happens after the pipe is set? About how long will it take to determine the potential of the well?
They still have to drill the horizontal. Then they will set production casing, perferate and frac. Then they will test the well.
How long depends on how fast they can finish, and if they are ready for the next steps...look at the timing of the same companies recent wells in the same area. If you are a royalty owner, show up at the drillsite and see if the toolpusher or driller will tell you whats going on.
Thanks, Baron!

RSS

Support GoHaynesvilleShale.com

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service