There is now well signage along Roberts Road for McCoy #9 H1 (Serial #239456) in Section 9 (just north of Section 16) and McCoy 16 H1 (Serial #236760) in Section 16. Pad has been constructed and I'm told a rig is going up for McCoy #9. I believe they are constructing a pad for the Section 16 well.
No I am sorry I dont. I got that information from a landowner that checked out the Pipeline meter. However I have heard the well actually came in at 8.5 million and they choked it back due to pipeline capacity.
Last cumlative recorded was 75787 MCF that was sometime last week.
Thanks NA for the reply. I think alll agree that it is simply TOO EARLY in this play to get an accurate reading on production. I for one think that it will be at least another 12-18 months (maybe a bit longer) before we can really get a handle on things.
NOTE: Sec. 22 Marr well is REALLY messed up! Talked to landowner yesterday. He's really disgusted (and rightly so). They're trying to fish ( or better said "chew") out tubing a chunk at a time, He say so far they have spent a little over 6mm in this effort.
Ouch I had heard they were having problems with the Marr well. Hopefully I will get some info on the Martinez Wells in Sections 11 & 14. I think Chesapeake has built a location for Section 10. I know a few of the landowners in that area so they let me know how their fortunes are going lol
Yes, please do report. The more info we all have the better off we all are of course. The Sec 15 well had a SPUD date of 4/1 or 4/2, I believe. Therefore to see such a substantial drop from (8.5 to 2 or 3 mmcfd) in basically what amounts to a matter of only days is out of sync with other reports. Again, can't draw accurate conclusions as to the ultimate production payout and/or longevity of the well from this data. And, yes, pipeline restrictions and market conditions most definitely do have an impact on ongoing production figures.