Not much out there but found this:
http://wilderness.org/sites/default/files/Fair-Market-Value-Whitepa...
See pages 61-68
Page
66
of
74
Photovoltaic: The MW capacity f
ee is $5,256 per year, calculated as
(authorized capacity on public land
in MWs) X (8,760 hours per year) X
20 percent capacity factor) X (5.0
percent Federal bond yield) X ($0.06
average price per kilowatt hour) X
(1,000 kilowatts per MW) = $5,256 per
year for each MW of capacity.
Concentrated PV and concentrated so
lar power without storage: The MW
capacity fee is $6,570 per year, calcu
lated as (authorized capacity on
public and in MWs) X (8,760 hours pe
r year) X (25 percent capacity
factor) X (5.0 percent Federal bond yield) X (0.06 average price per
kilowatt hour) X (1,000 kilowatts per MW) = $6,570 per year for each
MW of capacity.
Concentrated solar power with storag
e capacity of 3 hours or more: The
MW capacity fee is $7,884 per yea, calc
ulated as (authorized capacity on
public land in MWs) X (8,760 hours pe
r year) X (30 percent capacity
factor) X (5.0 percent Federal bond
yield) X ($0.06 average price per
kilowatt hour) X (1,000 kilowatts per MW) = $7,884 per year for each
MW of capacity.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com