Tags:
James,
There are several reasons for a well to require a workover rig, in this case I believe it is to install production tubing. Some operators run production through the 4 1/2 or 5 inch production casing for the first 10 or 12 months, then they come in and install 2 3/8 production tubing inside the casing. This operation requires a workover rig. I have not heard any news on sections 7, 18 or 19, but in due time these sections will have multiple wells.... it just requires a little patience on our part.
That looks like a house pad,if its the one I saw!
Looks like they have the form built.There is a black sign with white lettering on Hwy 171 which should say what is going in there. Pickups are driving down the dirt road. This is on EAST side of 171 up and across from the fire station
kittycatmama,
Someone is building a house, frame work has started to go up. This is not an entrance to a well pad site. Encana will most likely access the section 8 & 17 gas factories from the Long Road, however this is strictly a guess on my part (nothing to confirm).
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com