Tags:
James,
There are several reasons for a well to require a workover rig, in this case I believe it is to install production tubing. Some operators run production through the 4 1/2 or 5 inch production casing for the first 10 or 12 months, then they come in and install 2 3/8 production tubing inside the casing. This operation requires a workover rig. I have not heard any news on sections 7, 18 or 19, but in due time these sections will have multiple wells.... it just requires a little patience on our part.
That looks like a house pad,if its the one I saw!
Looks like they have the form built.There is a black sign with white lettering on Hwy 171 which should say what is going in there. Pickups are driving down the dirt road. This is on EAST side of 171 up and across from the fire station
kittycatmama,
Someone is building a house, frame work has started to go up. This is not an entrance to a well pad site. Encana will most likely access the section 8 & 17 gas factories from the Long Road, however this is strictly a guess on my part (nothing to confirm).
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by