It's a vertical science well so there may not be much to watch. In addition to coring and logging the TMS EOG has stated that they will use this well to monitor the frac on their first horizontal TMS well.
From a recent onsite inspection we learned this: Two drilling rigs are being used for the current well, the first a verticle monitor well, and the second will be the actual horizontal drilling rig. The pads for the two rigs are about five hundred feet apart. The monitor well is at 7000 feet. The second rig has not been put up yet.
Water for fracking will be pumped from Red RIver. The water pipeline has not been run yet.
The rig is at the 11 mile marker on highway 452.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
97 members
34 members
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com