I thought I would post this picture, since I know the owners of the property are out of state. Even tho it's not the best of pics, I know I would love to know what all was going on. Today they are running casing, looks like 7 5/8.
Les,
I'm gonna date myself, but the last time I was on a rig was Sawyer Rig #10 watching Earl sling tongs or throw the chain. He had changed from a cushy sit in a trailer job to hard work. Go figure lmao
Earlene the barefooted UMO
Teresa, I assume you mean the gas sales pipeline. There are many in the area so it is hard to predict. Once connected the pipeline should have signs at the road crossings that would show the pipeline company name.
J,
They have TD'd this puppy. (Total Depth) The Mud Logger's trailer is gone. The mud logging company is only released once they have reached TD. They are pulling pipe as I type this. There is still alot of work to be done b4 the frac job. Casing (production pipe for lateral) has been on site since 10/13/2009.
Just alitte update for you,
Earlene the barefooted UMO