This discussion is continued from the Tuscaloosa Marine Shale Group.
http://www.gohaynesvilleshale.com/group/tuscaloosamarineshale/forum...
Link to SONRIS Lite well file: http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
Tags:
Nabors Drlg Rig #X17 reported 44 days Drilling Ahead @ 17,804', 4/25/14
Nabors Drlg Rig #X17 reported 51 days Drilling Ahead @ 19,442'', 5/2/14
1500' from max MD with final casing string still to be set. With no set backs, maybe another week.
Excerpt from GDP presentation, May 6"
The Company has recently moved into completion operations on its Nunnery 12-1H #1 (94.1% WI) well in Amite County, Mississippi and its Beech Grove 94H #1 (66.7% WI) well in East Feliciana Parish, Louisiana, with plans to frac both wells in May;
Nabors Drlg Rig #X17 reported 58 days Drilling Ahead @ 19,771', 5/9/14.
GOODRICH PETROLEUM ANNOUNCES TUSCALOOSA MARINE SHALE ("TMS") WELL RESULT AND OPERATIONAL UPDATE
HOUSTON, June 18, 2014 /PRNewswire
EXCERPT
The Company has also completed frac operations, drilled out the frac plugs and will commence flow back on its Beech Grove 94H-1 (66.7% WI) well in East Feliciana Parish, Louisiana this week, with results expected by the end of June. The Beech Grove well was drilled with an approximate 6,000 foot lateral and completed with 21 frac stages.
Link to full article: https://finance.yahoo.com/news/goodrich-petroleum-announces-tuscalo...
GDP will announce it before the completion report is filed with the state and becomes public record.
HOUSTON, July 7, 2014 /PRNewswire/ -- Goodrich Petroleum Corporation (NYSE: GDP) today announced the completion of its Beech Grove 94H-1 (66.7% WI) well in East Feliciana Parish, Louisiana. The well has achieved a peak 24-hour production rate to date of approximately 740 barrels of oil equivalent ("BOE") per day, comprised of 672 barrels of oil and 412 Mcf of gas on a 19/64 inch choke. The Beech Grove 94H-1 well was drilled with an approximate 6,000 foot lateral, landed in the Company's lower target and was completed with 21 frac stages.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
9 members
120 members
97 members
34 members
386 members
27 members
455 members
440 members
400 members
244 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com