PSHL = Proposed Surface Hole Location
PBHL = Proposed Bottom Hole Location
The PP is called differently by different companies. CHK is the only one I've seen who calls it PUPP. EOG uses "Perf. Pt." But it is usually the Penetration Point.
I'm attaching plats from 3 operators to you can see the differences. Another abbreviation you might see is TP for "Take Point".
Yeah, I just assume everyone has a TIFF reader, of some sort, and they don't. Sorry about that.
Phillip, once drilling is finished we (non-industry folks) don't have access to any further information about wells until the reports are filed on RRC. Now, it's just a waiting and watching situation.
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by