Can anyone in the area confirm a drilling rig in place in section 30? The pad is just north of San Patricio church in the NW corner of the section.
On Friday, Feb. 10, Nomac Drilling Rig #54 reported Rigging Up on the Chesapeake SUMC 30-9-13H #1 in Section 30 - 9N - 13W. Good Luck.
About 30 days from beginning to end of drilling. Then a wait for a completion crew. And then an additional wait if there is not a pipeline connection in the vicinity. Keep in mind that Chesapeake is planning to keep some production shut-in at current nat gas prices.
I'm assuming that merely drilling a well will not hold the lease if there is not production within some time frame. Is this correct and, if so, what time frame is there post completion?
Your assumption is correct. The rest depends on your lease language particularly that defining operations.
The expiration of an Oil & Gas lease when a well is drilled but not yet completed depends largely on the definition of "operations". Look to see if there is specific language in your lease regarding that term. If a well is not productive, a dry hole, and the lease term ends the lease has expired. In the case of a horizontal Haynesville well if a well has been drilled but not yet completed (fracked), the operator will contend, in court if necessary, that operations are on going with a well deemed to be capable of production.
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by