It appears they are preparing to frac. They have water ran to the site & a lot of activity happening. It's being referred to as the "frac site" by the Performance Group" workers.
Farmbrad,
Can you tell me if XTO has fracked the Hilltoppers-Banana Slugs Alloc # H2 and the Hilltoppers-Banana Slugs
Alloc. #B2 ??? Drilling of these two wells reached total depth in July and September of 2018.
The crews have been gone for a month or longer. Two weeks ago they were spooling up the water supply hoses. My assumption is they are finished.
They have turned in the 'Well Record Only' reports so they are waiting for RRC to approve all the paperwork & assign Lease ID numbers. Then they will turn the well on and do an IP test. No production reported thru December.
Thanks farmbrad and jffree for all the information.
307 members
286 members
6 members
49 members
409 members
691 members
253 members
7 members
549 members
20 members
Posted by don burkett on September 17, 2026 at 10:08
© 2026 Created by Keith Mauck (Site Publisher).
Powered by