It appears they are preparing to frac. They have water ran to the site & a lot of activity happening. It's being referred to as the "frac site" by the Performance Group" workers.
Farmbrad,
Can you tell me if XTO has fracked the Hilltoppers-Banana Slugs Alloc # H2 and the Hilltoppers-Banana Slugs
Alloc. #B2 ??? Drilling of these two wells reached total depth in July and September of 2018.
The crews have been gone for a month or longer. Two weeks ago they were spooling up the water supply hoses. My assumption is they are finished.
They have turned in the 'Well Record Only' reports so they are waiting for RRC to approve all the paperwork & assign Lease ID numbers. Then they will turn the well on and do an IP test. No production reported thru December.
Thanks farmbrad and jffree for all the information.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
9 members
120 members
97 members
34 members
386 members
27 members
455 members
440 members
400 members
244 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com