It appears they are preparing to frac. They have water ran to the site & a lot of activity happening. It's being referred to as the "frac site" by the Performance Group" workers.
Farmbrad,
Can you tell me if XTO has fracked the Hilltoppers-Banana Slugs Alloc # H2 and the Hilltoppers-Banana Slugs
Alloc. #B2 ??? Drilling of these two wells reached total depth in July and September of 2018.
The crews have been gone for a month or longer. Two weeks ago they were spooling up the water supply hoses. My assumption is they are finished.
They have turned in the 'Well Record Only' reports so they are waiting for RRC to approve all the paperwork & assign Lease ID numbers. Then they will turn the well on and do an IP test. No production reported thru December.
Thanks farmbrad and jffree for all the information.
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by