Questar E&P–operated Haynesville Shale well results
Well Name |
First Sales Date |
Working Interest |
24-hour peak IP rate |
Beckett 21H-1 |
Oct 23, 2009 |
100% |
20.2 MMcfd |
Jimmy Woodard 34H-1 |
Nov 14, 2009 |
100% |
22.5 MMcfd |
Jimmy Woodard 34H-2 |
Nov 14, 2009 |
100% |
23.7 MMcfd |
Weyerhaeuser 10H-1 |
Nov 30, 2009 |
81.6% |
13.3 MMcfd* |
Cupples (12)H-2 |
Dec 17, 2009 |
92.7% |
15.7 MMcfd* |
Sharp 2H-1 |
Jan 10, 2010 |
68.4% |
16.1 MMcfd* |
Sample 2H-1 |
Feb 6, 2010 |
77.4% |
14.3 MMcfd* |
Sample 2H-2 |
Feb 6, 2010 |
70.4% |
14.4 MMcfd* |
*Beginning with the Weyerhaeuser 10H-1, Questar E&P modified initial flowback procedures to minimize pressure drawdown at the reservoir; therefore, 24-hour peak IP rates are not comparable to earlier well results.
Tags:
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com