How do you know if the section a well is drilled in is the section they will pull the gas from? The bottom hole info is blank except for the lambert numbers in Sonris?
Am I right in thinking, I would need to look those up to determine if the bottom hole is in section 31 or is there some other kind of indication that the drilling will be done in another section?
I am asking because a person told me that the pad is in 31, but they will be pulling from 30, then another told me they would eventually pull from both.
Tags: hole, permit, sonris, well