See data from SONRIS below.  The well pad is in Section 5, but the horizontal portion and production will be in a unit to the north composed of Sections 31 & 32.  Petrohawk is the operator. 


Review Well Information


WELLS

SERIAL WELL NAME WELL NUM ORG ID FIELD PARISH PROD TYPE SEC TWN RGE EFFECTIVE DATE API NUM
240994 HA RA SUYY;ARNOLD 32 H 001 P251 4313 09 00 005 16N 16W 03/09/2010 17017348560000
PRMT DATE SPUD DATE STAT DATE ST CD
03/09/2010
03/09/2010 01
WELL SURFACE COORDINATES

Surface Longitude Surface Latitude Lambert X Lambert Y Ground Elevation Zone Datum
94-1-20.652 32-24-48.116 1530182 638673 280.1 N NAD-27
WELL SURFACE COORDINATES GENERATED BY DNR

UTMX 83 UTMY 83 LONGITUDE 83 LATITUDE 83
403843.0862021 3586734.34048667 -94.02260771 32.41353428
BOTTOM HOLE COORD

EFFECTIVE DATE END DATE PLUGBACK TOTAL DEPTH TRUE VERTICAL DEPTH MEASURED DEPTH LAT DEG LAT MIN LAT SEC LONG DEG LONG MIN LONG SEC COORDINATE SOURCE LAMBERT X LAMBERT Y ZONE COORDINATE SYSTEM
03/09/2010

10969 16348 32 25 40.211 94 1 23.679 02 1529997 643941 N 01
WELL HISTORY

SERIAL WELL NAME WELL NUM ORG ID FIELD ST CD PT WELL CLASS EFF DATE END DATE STAT DATE
240994 HA RA SUYY;ARNOLD 32 H 001 P251 4313 01 00
03/09/2010
03/09/2010
SCOUT INFO


REPORT DATE WELL STATUS MEASURED DEPTH TRUE VERT DEPTH DETAIL
03/09/2010 01 16348
214' FNL & 884' FEL OF SEC 5. PBHL: 250' FNL & 1140' FEL OF SEC 32, T17N-R16W.

Views: 146

Replies to This Discussion

Drilling has started. As of April 23, they had reached about 1800 feet on the vertical drill, and should be ready for the horizontal drill by mid-May, and possibly fracing by sometime in June.
Vertical and horizontal drilling complete. Does anyone know if fracing has started?
Equipment for fracing in place as of July 21. Should begin soon if it has not already started.
Fracing underway for more than a week.
Fracing is now complete with 15 stages done. Field personnel state that the frac went well with no technical problems and initial pressures look good. Haliburton will be leaving the site soon. Petrohawk will come in to remove the plugs and test the well. A pipeline is already in place to market the gas.
Well now in production on restricted choke of 12/64. 7000 psi at wellhead. Producing about 5 mcf/day.
The well is listed in SONRIS at 4409 MCFD, but this is on a very restricted choke of 12/64. The pressure is good at over 7000 psi, so I assume this well is as good as others in the area potentialed at 10-13 MCFD.
Has anyone leased any land in Southern Forest Acres, Section 32, 16N, Caddo Parish? No one has approached me about leasing my lot there and it looks like it is in this area.
I am not sure, but I think the Section 32 where you have interest is not the same one where this well is being drilling. You listed 16 N. This one is in Section 32, 17 N 16 W.
You must be right. My lot is Section 32 - 16N - 14W Caddo Parish. But neighbors tell me that section has leasing activity.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service