with the encana gas factories, will all 8 wells be drilled back to back or over a period of several years? Encana is setting up several gas factories off Red Bluff Rd., so apparently they have a place for the gas.
KCM, for a true "gas factory" pilot EnCana should drill several wells back-to-back to test out the concept. Be aware that every large pad is not necessarily immediately going to be gas factory pilot but rather is built for the future. Well permits and actual drilling will reveal the true gas factory pilot locations. I do expect 1-2 of the pilots to be located in DeSoto Parish.
According to DNR, Encana is requesting 8 additional wells for sec. 9. Have not seen any permits for them yet. I know in Sec. 7/ of 14/14, that is also under consideration to be a gas factory . A lot depends on what Sec. 6 & 7(Packert wells) do. They are going to pipeline tomorrow, so should know the flow soon
Les, look at April 20 docket for DNR. It shows where wells in Sec. 4 and Sec. 9 (14/14) are going. About a mile south of this same line of wells, Exco is setting up their own multiple well system. These are off Long RD which connects Red Bluff to Hwy 5
RE: 14/14 Desoto: Les, Exco is now applying to DNR for 8 wells in Sec. 10. There are multiple wells going in Sections 4, 9, 21. What is up with that little pocket. All these multiple wells going into one small geographical area.