Section 009-09N-12W now has one well drilled, two wells drilling, and eight more wells permitted.  WOW!!!!!  Drill baby drill!

Views: 2101

Replies to This Discussion

Hi uncle G and Donna, they finished up drilling and moved trinidad 124 off the Theresa Spears location. Hopefully they will finish up on the Deanna Sistrunk location pretty soon.  Tim
Was that the lateral or just the vertical?

They have been on both locations quite a while.  I would think lateral.  Could be wrong though.

 

What happened with Jimmy Ray Brown 2?  Is it on or off?

yes it is flowing. did about 15mcf/d in August. about 12k/d in Sept and currently on a 12k rate a day in October.
Sorry for the slow response, been busy. They finshed all six laterals on the Thresa Spears location. Hey Pelican is that 12 thousand cubic feet a day or 12 million cubic feet a day on the Jimmy Brown #2? Thanks for the info                        Olyman
Thanks, Pelican, for the update on Jimmy Ray Brown 2.  Much appreciated.

The Deanna Sistrunk CDP started flowing at 4:30 on 1/2/2012 and the Teresa Spears started flowing also at around 4:30 pm on 12/31.  don't know the flow rate just yet.  they had to shut the Jimmy brown in during the fracing but it came back up on 12/29 but looks like it went back down  late on the 31st.   it had gone down on 11/27 due to that frac work.

Thanks for the updates Pelican.  What is CDP?

CDP stands for custody transfer point. that is where there is multyply wells behind a meter station that delivers to one meter(for instance here- Centerpoint Energy Field Services). They measure the total of all meters tied to the meter that measures gas into their system.  In this case this would be limited all wells drilled in this section flowing under one meter station that CEFS has set up for this particular point.  Whether one or up to maybe 8 if they- encana/shell drilled in that section. They (CEFS) will normally set one meter to measure gas on a gas factory pad.  ...and also the J. Brown still is not back up as of today.

 The T Spears flowed about 27800 the last of Dec.  Came back on Tuesday and flowed about 14800.  The D. Sistrunk started flowing Monday.  2800.  Tuesday it did about 9700 MCF.  These are all in MCF.

 

Oh, okay.  I understand.  I think this may be why Sonris reports all of the producing wells in a section as having the same production amount no matter which well you check on their site.  They all have same collective total production volume.  Thank you!

I would think Shell/EnCana would report production numbers off each individual meters.  Keep in mind that the producer and the gatherer have to report the same numbers for the wells to the DNR.  That keeps these guys honest.  So if one reports a different number then they get error statements from the DNR and they will have to figure out what the problem is and then the one with the error will have to fix and report the correct volume.  It is a dang good check just to make sure everyone is on the same page. The DNR allows a little tolerance, but not much. 

...and my bad.  had my mind somewhere else.  CDP stands for Central Delivery Point.  Multi wells on one pad delivering to one meter.    sorry. 