140
Tags:
When they P&A a well they pump cement down the well bore and cut the pipe off below the surface by several feet. They generally don't do this when they temporary abandon a well.
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by