Completion and allowable data will be online sometime next week for the Comegys 6-7H, Comegys 32-29H and the Volentine 5-33H. I think there are additional completed and tested wells that will follow soon after those first three. I'll post results here once the data is uploaded to the state database.
Tags:
They stopped drilling these wells three months ago. They are just now reporting these wells complete. There are three other wells that were spud back in the spring. Two do not appear to have the lateral drilled. Just the vertical and then nothing. Perhaps they tested the interval and it looked the same as in these wells. No need to throw good money after bad.
its funny, they were just proposing a new unit a couple to three weeks ago. my mom got noticed on it. the well would encompass the s/2 of volentine section 5 and the entire section below.
maybe the right hand doesn't know what the left one is doing.
Land department and legal do their thing until operations tells them to stop. It doesn't cost much to file a unit application. Maybe APC will have better luck in Cass County.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
97 members
34 members
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com