I am trying to find information about how a well was P & A'd in Louisiana in 1989. I need to know if explosives were used or if the casing was mechanically cut. The cutting took place at 2450'. Are explosives still allowed and if not, what year did they make it illegal? I have the P & A paperwork and it isn't noted what took place.
Tags:
JMAN,
It doesn't say what kind of charge it was. Also remember the information in the PA report might not always be 100% accurate. Depending on multiple factors (Operator, Industry Economics, Type of Well, Location, and Regulatory Supervision) the performed work details and procedures described reported on the PA report and submitted to the state might not "ACTUALLY" be entirely 100% accurate.
Here is a link to a site that describes cutting charges.
http://gekengineering.com/Downloads/Free_Downloads/Pipe_Cutoff.pdf
It doesn't say. My understanding is that the most common cutting of casing is a shaped charge. Its quick, easy and cost effective. With a casing salvage operation there is no reason to have a pretty cut. You only need a milled cut if you are replacing damaged casing.
Thanks Joe. The company who performed the P&A just called and they did indeed use an explosive charge.
This is an interesting thread and another example of someone brand new to the site getting information that they could not get anywhere else (at least in layman's language).
Go Haynesville Shale is one of the most helpful blogs I have ever been on.
286 members
6 members
49 members
409 members
691 members
253 members
7 members
549 members
20 members
196 members
Posted by don burkett on September 17, 2026 at 10:08
© 2026 Created by Keith Mauck (Site Publisher).
Powered by