This well is located in the Stonewall area:
In July 2016, Chesapeake placed the CA 12&13-15-15 1H horizontal well on production, targeting the Haynesville Shale in Caddo Parish, Louisiana. This well's results provide further confirmation that the company's current completion optimization techniques, along with extended laterals, are having a significant impact on higher sustained flow rates and the increased potential for higher rates of return in all areas of the Haynesville. With reducing cluster spacing and increased proppant loading, this 10,000-foot lateral well reached a maximum production rate of approximately 38.0 million cubic feet of gas (mmcf) per day with a flowing tubing pressure of 7,400 psi. The company's current estimate of the ultimate recovery from this well is approximately 22 to 24 bcf with an estimated completed well cost of approximately $9.8 million.
Jay
Tags:
EXACTLY. I get that too!!! I don't think people realize the investment these companies make
Vine has a few long laterals planned. Looks like 9000'. Anyone know of any prior experience they have had or how productive they have been? Thanks.
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by