Is a Survey Platt required to be completed/provided before a Horizontal well can be drilled?
What is the process here?
Tags:
A unit survey is not required before a horizontal well is drilled. The requirement is that a unit survey plat is to be submitted by the operator to the state within 90 days of first production of the original unit well. The requirement is rarely enforced. I lobbied the OOC and the DNR and finally the governor's office in 2018 to enforce the regulation. That succeeded until Covid hit. The O&G industry lobbied for a moratorium which was granted in early 2020. Since then some operators continue to turn in delinquent surveys, others do not.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com