Just noticed that EOG received a permit on 25 March 2009 for a well on S35-T12N-R13W, located on Billingsley property (Billingsley35 #1). They have already begun intensive site prep, and I believe they are moving the rig "Nabors F38" on to the site as soon as it finishes its current location. My understanding is that they will be drilling the James Formation in the Trenton Field.
Tags: EOG, S35, new, well
- Attachments:
-