I have a friend that lives in 18-15N-13.  She says the well pad for The Davis Well in 7-15N-13W has been enlarged to about double it's original size and has been non stop construction for the past 3 months.  

Views: 220

Reply to This

Replies to This Discussion

Do you know the approximate size of the pad, Bobi?  It doesn't take 3 months to prepare a pad, even a large one however pads are often used as locations to temporarily store equipment and materials.  There can be a lot of coming and going without any actual construction taking place.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2025   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service