Brix will drill an HC well in 31-12-10 and 6-11-10, the later being a Tellurian operated unit.
Vine will drill an HC well in 7 & 18 - 11-10, Section 18 is a Tellurian operated unit.
Tellurian will continue to operate and report the unit wells in 6 & 18 - 11-10 and may drill additional H wells in the future.
Brix and Vine will drill, operate and report the HC wells in the subject units and any additional HC wells that may be drilled in the future.
Tags:
386 members
97 members
59 members
399 members
242 members
172 members
455 members
118 members
87 members
10 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com