Brix will drill an HC well in 31-12-10 and 6-11-10, the later being a Tellurian operated unit.
Vine will drill an HC well in 7 & 18 - 11-10, Section 18 is a Tellurian operated unit.
Tellurian will continue to operate and report the unit wells in 6 & 18 - 11-10 and may drill additional H wells in the future.
Brix and Vine will drill, operate and report the HC wells in the subject units and any additional HC wells that may be drilled in the future.
Tags:
11 members
458 members
151 members
195 members
19 members
406 members
252 members
388 members
174 members
68 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by