I own property in DeSoto Parish in S36-T15N-R15W, S31-T15N-R14W, and S20-T15N-R14W. Chesapeake started drilling S36 on 8/26/08. They set pipe and the well is WAITING ON COMPLETION. They started drilling S31 on 10/21/08. There is not a proposed drilling unit on S20.
Look to see if any wells are permitted in your section.
They may be waiting on a rig.
We tend to build locations as soon as we can. Scheduling a rig is difficult at best. Somtimes a spot on the rigs schedule will open up. Whomever has the next location ready could get bumped up. Last year we where bumped up because the location sched. before us was under water.