In each SONRIS Well File there are two sections that deal with re-fracks/re-completions. In the Scout Info and at the very bottom of the page in the Work Permits section, in bold in this example
SERIAL |
WELL NAME |
WELL NUM |
ORG ID |
FIELD |
PARISH |
PROD TYPE |
SEC |
TWN |
RGE |
EFFECTIVE DATE |
API NUM |
HA RA SUL;HARRIS 10-14-11 H |
002-ALT |
010 |
14N |
11W |
01/10/2019 |
SCOUT INFO
REPORT DATE |
WELL STATUS |
MEASURED DEPTH |
TRUE VERT DEPTH |
DETAIL |
05/24/2023 |
12 |
16882 |
12118 |
RE-COMPLETED 8/25/21; GAS; 7101 MCFD; 16/64 CHOKE; 5814# FP & CP; PERFS 12370-16791' |
09/16/2021 |
09 |
16882 |
RECOMPLETION OPS ONGOING |
|
01/05/2012 |
10 |
16882 |
COMPLETED 10-10-11; GAS; HAYNESVILLE RA; 11,012 MCFD; 16/64 CHOKE; 572 BWD; 8475# FP; 8475# CP; PERFS 12,370-16,790' MD |
WORK PERMITS
REFERENCE NUMBER |
APPLICATION DATE |
EXPIRATION DATE |
WORK PERMIT TYPE |
WORK PERMIT STATUS |
WORK PERMIT STATUS_DATE |
TOTAL DEPTH |
WORK_PERFORMED |
DOCUMENTATION RECEIPT DATE |
TEST SAND |
WORK DESCRIPTION |
|
|
|
|
|
|
|
|
|
|
|
133-21-3-14 |
03/08/2021 |
03/08/2022 |
HYDRAULIC FRACTURE STIMULATION |
EXPIRED |
08/17/2022 |
16974 |
N |
MIRU WOR & PULL TBG AND CLEANOUT CSG TO 16,840’ PBTD, RUN 3.5” LINER TO 16,825’, CEMENT LINER IN PLACE AND BACKOFF 100’ ABOVE TOC, PERF LINER AND FRAC HAYNESVILLE FROM 12,370’ TO 16,790’ WITH 29 STAGES. |
Tags:
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by