How long does the typical Hooston formation well take to start producing after
the wells Spud date? (EX. Section 033-16n-13w Hoss SU97; B Debreck 33) ?
Tags:
It would seem that a well would first have to be turned to sales and producing before "shut-in" language would apply.
Oncea well is completed the operator opens the chocke to either flare the gas prodced or flows the oil into a holding tank gauging the rate of production to file a potential test report to the state reulatory agency. The agency then determines a daily allowabe limit to produce the well. If gas is the product and without the ability to transport the gas via pipleline the shut-in provision is a tool for mututal benefit to both royalty owner and the operator.
I am not sure what you mean when stating a well "turned into sales."
William, "turned to sales" is an industry term used in reports to the Office of Conservation. It is the date that the gaseous and/or liquid hydrocarbons are introduced into a pipeline to be transported to an end user or point of sale It appears in most of the database well files.
Thank you as I know a little about everything but not everything about anything. Knowledge is power but too much knowledge cn be a dangerous thing to have.
Have not worked in Louisiana since 2009 when I left Shreveport working Desoto Parish. Appreciate your comment as it is good to know if needed in the future.
459 members
240 members
257 members
442 members
302 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by
GoHaynesvilleShale.com is where mineral owners, landowners and oil & gas professionals discuss the Haynesville Shale, Austin Chalk, Terryville Complex, Tuscaloosa Shale, Lower Smackover Brown Dense and lithium plays. Ask questions, share what you know, and keep up with activity in your parish or county. [ Read More ]