How long does the typical Hooston formation well take to start producing after
the wells Spud date? (EX. Section 033-16n-13w Hoss SU97; B Debreck 33) ?
Tags:
It would seem that a well would first have to be turned to sales and producing before "shut-in" language would apply.
Oncea well is completed the operator opens the chocke to either flare the gas prodced or flows the oil into a holding tank gauging the rate of production to file a potential test report to the state reulatory agency. The agency then determines a daily allowabe limit to produce the well. If gas is the product and without the ability to transport the gas via pipleline the shut-in provision is a tool for mututal benefit to both royalty owner and the operator.
I am not sure what you mean when stating a well "turned into sales."
William, "turned to sales" is an industry term used in reports to the Office of Conservation. It is the date that the gaseous and/or liquid hydrocarbons are introduced into a pipeline to be transported to an end user or point of sale It appears in most of the database well files.
Thank you as I know a little about everything but not everything about anything. Knowledge is power but too much knowledge cn be a dangerous thing to have.
Have not worked in Louisiana since 2009 when I left Shreveport working Desoto Parish. Appreciate your comment as it is good to know if needed in the future.
307 members
286 members
6 members
49 members
409 members
691 members
253 members
7 members
549 members
20 members
Posted by don burkett on September 17, 2026 at 10:08
© 2026 Created by Keith Mauck (Site Publisher).
Powered by