It looks like the new pad is about built in 19 11 15. I looked at it today and it is probably 4-5 acres in size. It is down the Pierce Road off Hwy 191. Also it looks like the rig is gone on the Marr Well in sec 22 11 15.

Also the row is built and stopped at the Mills Road, with pipe unloaded on the ROW, which looks to be about 16 inch, from a distance. This is running east and west .

The court house is still full of people, you cant stir them with a stick. Every day there is a new crew coming. Most of them are abstractors, surveyors, seismic crews, and other people looking for water ponds. The traffic is terrible down Hwy 191 with all the drilling equipment
and heavy land clearing equipment.

Views: 26

Reply to This

Replies to This Discussion

I looked at the pad too. It looks like a frac pond may be built on the east side of the pad, they cleared out enough space.
Send one of those rigs to Section 36 in 11/15.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service