Curious if anyone has had experience dealing with a proposed "short section"? Just got an ALT well notice that Vine is asking for CUL's that only take in half of our section. I suspect that the east / west lateral that Encana drilled in the same section has something to do with this. Thanks.
Tags:
A lot of CUL's include less than a full section. IMO well designs are often based on the perceived optimal lateral length and existing surface locations. The state approved production allocation formula does not mandate a minimum linear perforated lateral length in a section.
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by