T2660

TORRENT OIL LLC

 

Well Serial

Well Name

Well Num

Status

 

 

 

Org ID

Field ID

Permit Date

Sec-Town-Rng

Parish

1

250724

AUS RA SUVV;TORRENT

001

01

 

T2660

0800

19-JAN-18

033-02S-06E

49

 

15603

2

250725

AUS RA SUUU;TORRENT

002

01

 

T2660

0800

19-JAN-18

005-03S-06E

49

 

15797

3

250795

INDIGO MINERALS

001

01

 

T2660

0800

12-FEB-18

023-02S-05E

05

 

15624

Views: 3798

Replies to This Discussion

The application notes a "pre-application conference" which was held prior to the application reaching the Commissioner's public hearing schedule.  Therefore the surface owner, Turner Lumber Company, must have signed off on the application.

This has been going on for months. It's no big secret. I was told the landowners didn't want to sign a new lease. So Torrent was trying to get a rig in there to hold the old lease. Last I heard, and I could be wrong, but I thought a rig was supposed to be floated in to spud because the parish wouldn't upgrade the bridge.

I thought Torrent offered to upgrade the bridge and did not get parish approval.

Yes, I think you're right, John.

The last Torrent well, AUS RA SUXX;Indigo Minerals #1, was permitted 2/18/2019.  It was a six month permit which has now expired.

WELL HISTORY

SERIAL WELL NAME WELL NUM ORG ID FIELD ST CD PT WELL CLASS EFF DATE END DATE STAT DATE
251564 AUS RA SUXX;INDIGO MINERALS 001 T2660 0800 01 00 02/18/2019 02/18/2019

SCOUT INFO

REPORT DATE WELL STATUS MEASURED DEPTH TRUE VERT DEPTH DETAIL
08/12/2019 05 5 RE-DRILL OF SN:154571; LOCATE & DIG UP WELL ON 7/5/19; CUT CSG & INSTALL WELLHEAD ON 7/6/19; FINISHED INSTALLING WELLHEAD ON 7/7/19;
02/18/2019 01 15624 N 47 D 13' 38" E 13,886.63' FROM NGS MON. "NUGENT" TO LOC IN SEC 23-T2S-R5E. (REPERMIT OF SERIAL #250795-EXPIRED)

John, I don't think installing a wellhead constitutes a spud of a new drill prior to the expiration of the permit. I think this well status will be updated as a "03", permit expired.

LOGA keeps reporting that Torrent has a rig drilling.

No Torrent rig appeared in last Friday's Weekly Rig Report.  Not even as "assigned". Of course one may appear on this Friday's report but the six month permit expired on 8/16/2019.  So does replacing the wellhead constitute a "spub"?  Haven't seen this before but could check with OOC.  Or we can just wait until Friday evening when the report comes out.

OOC confirms that setting a new wellhead, like spudding a well, maintains the permit to drill in force.  I'll try to remember to post the specifics from the next Rig Report.

RSS

Support GoHaynesvilleShale.com

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service