Expansion to follow. 80)
http://www.marketwatch.com/story/us-infrastructure-holdings-to-acqu...
"USI will immediately begin construction of a 20-mile extension at the southern end of the Wildcat System to provide producers with direct access to markets served by Gulf South Pipeline Company, LP, and Tennessee Gas Pipeline. The expansion project will bring Wildcat's total takeaway capacity to 400 MMcf/d and is expected to be complete by mid-2012. The Wildcat System currently offers interconnects to four regional gathering systems: Enterprise Products' State Line Gathering System, KinderHawk's Gas Services, Producers Gas Transmission and Tristate Sabine Gathering System."
Tags:
This is starting to take shape, they are fixing to start survey work.....16" line.
So is this due to the new wet gas being drilled in east Texas and western LA
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com